March 24th 2016
Parliament inverted during ‘normal working hours’. The first test run having been carried out on Christmas Eve, 2015 and still to be inverted as a pinhole exposure.
I have experimented with bow using only a pinhole but am yet to push and pull it back up the Old Kent Rd. There’s still a dream in me that ETC will make that trip but perhaps I need to finish what I started with bow first.